Representative Standoff Distances — UFC 4-010-01, Appendix C

Planning standoff for conventional construction by level of protection, wall type, explosive weight and load-bearing condition, with roof, window and minimum standoff — UFC 4-010-01 (12 December 2018, Change 3, 24 May 2024), Tables C-1 to C-4.

Threat and construction

Tabulated weights: 55, 220, 550, 1 100, 4 400 and 19 800 lb (25, 100, 250, 500, 2 000 and 9 000 kg). Other weights use the next larger tabulated weight.

Standoff

Governing standoff (wall and minimum)—
ElementUFC valueRecommended

Standoff versus explosive weight — selected wall, all levels of protection

Solid lines: UFC table values. Dashed: recommended monotone envelope where a lower level lists a larger standoff. Logarithmic axes.

Expeditionary structures — Table C-6

Standoff (Table C-6)—

All 96 cells parsed from the document and checked against the printed metre values; 28 cells are "No Data Available". Findings: 4 400 lb / Low / TEMPER tents prints 447 ft but (145 m) = 476 ft — the larger is used; the weight labels print "220 lbs (25 kg)" and "1100 lbs (550 kg)" (should be 100 kg and 500 kg). Unlike Tables C-1 to C-4, Table C-6 never lists a smaller standoff for a higher level of protection.

UFC 4-010-01DoD Minimum Antiterrorism Standards for Buildings, 12 December 2018, Change 3 (24 May 2024), Appendix C, Tables C-1 to C-4 (public domain). Values parsed programmatically from the document and cross-checked against the printed metre values.
FindingsFour roof cells print feet and metre values that disagree (two metre values match the window row below); the larger value is used. For three wall types at the two largest weights, a higher level of protection lists a smaller standoff than a lower level — physically a stricter level cannot need less standoff, so the monotone envelope is recommended alongside the UFC value.

Preliminary calculation tool. Final design requires the full text of ACI 318 and review by a licensed PE. This tool follows ACI 318-19, the edition referenced by the 2021 and 2024 IBC; ACI CODE-318-25 was published in January 2025 and is expected in the 2027 IBC (changes include development length equations and seismic provisions).